Architected LunaMission end-to-end: spent 5–6 days on intensive astrodynamics and dataset R&D followed by nearly two weeks of systems engineering. Built with Team Softsasi, uniting NASA LOLA 20m laser altimetry with JPL Horizons ephemerides to forecast lunar south-pole solar access and Earth line-of-sight.
At the Moon's South Pole (80°S–90°S), the Sun skims the horizon like an endless sunset due to a 1.54° axial tilt, casting 50+ km shadows that drop temperatures to -200°C and freeze lander batteries. Simultaneously, lunar libration causes Earth to dip behind crater rims, severing direct-to-Earth (DTE) communication. A minor rocket launch delay completely shifts shadow patterns, turning sunlit landing zones into pitch darkness.
Operating Constraints:
Using NextRush for the backend microservice alongside precomputed LOLA horizon masks gave the application instantaneous reactivity. Judges and testers praised the sub-second launch-delay slider.
Real-time dynamic PSR (Permanently Shadowed Region) traversability pathfinding for rovers was scoped out due to sprint time limits and terrain mesh memory constraints.
Mission-critical aerospace applications require rigorous separation of epistemic observables: geometric line-of-sight must never be conflated with usable electrical power or RF link closure.